Liftshaft Excavation
May 16, 2010 Preparation of the basement continues with the excavation of the liftshafts for the three buildings and crane pits. The shoring and piling on the retaining wall is being cleaned for the waterproofing.
- 10 lift-shafts excavated
- Crane pits excavated
- Cleaning of the shored wall for waterproofing
|